Development or use of land in an area regulated by the Shoreline Master Program and Shoreline Management Act, where the Bellevue Land Use Code requires a conditional use permit for that use. A conditional use requires a separate shoreline substantial development permit. (WA)

Apply for this permit online at MyBuildingPermit. When entering your Application Information, choose the following:

  1. Application type: Land Use
  2. Project type: Nonresidential or Multifamily Residential or Single Family Residential
  3. Activity type: Shoreline Development
  4. Scope of work: Shoreline Conditional Use

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.

For assistance with electronic plan submittals, refer to Requirements for Electronic Plans

Fees and Timelines

Contact

Permit Center
Telephone
Hours
In-person Permit Center services are available Monday to Thursday 10 a.m. - 3 p.m.

The Permit Center will be open on Friday from 10 a.m. - 3 p.m., although customers visiting City Hall may be served remotely by permitting staff.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.