Skip to main content
Bellevue home
  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks & Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • ADA and Language Access Resources
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
    • Local Service Agencies
City of Bellevue, WA Development Services
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt

Street Lighting Plan

Breadcrumb

  1. Home
  2. City Government
  3. Departments
  4. Development Services
  5. Permits
  6. Plan Submittal Resources
bellevue_41370754157.jpg

How may I help you?

This is an artificial-intelligence (AI) chatbot designed to provide general information about various city topics. If you are having an emergency of any kind, please call 911 immediately. The chatbot is still learning about all of our services and may occasionally provide an incorrect answer.

Give Feedback
  • Copied to clipboard

    Plan Submittal Resources

    • Addressing Site Plan
    • Administrative Departures
    • Architectural Plan
    • Assessors Map
    • Basic Site Plan
    • Boundary and Topographic Survey
    • Building Design Documents
    • Building Elevations
    • Building Floor Plan
    • Clearing and Grading CSWPPP Requirements
    • Comprehensive Plan Policy
    • Deferred Submittal Guidelines
    • Design Guidelines
    • Easements Plan
    • Egress Lighting Requirements and Inspection
    • Fire Response Plan
    • Generator Permit Requirements
    • Landscape Plan
    • Lot Layout Plan
    • Mitigation Plan
    • Onsite Exterior Lighting Plan
    • Plat Map
    • Pool and Spa Plan
    • Preapplication Conference for Preliminary Plats and Planned Unit Developments
    • Preliminary Civil Plans
    • Preliminary Storm Drainage Report
    • Preliminary Traffic Plans
    • Project Proposal
    • Requirements for Recorded Documents
    • Residential Site Plan
    • Road Plan
    • Shoring Plan
    • Sign Permits - Building Review
    • Sign Permits - Plans and Drawings
    • Site Coordination Plan
    • Site and Infrastructure Design Documents
    • State Construction Stormwater General Permit
    • Storm Drainage Report
    • Stormwater Site Plan
    • Street Lighting Plan
    • Structural Plan Requirements
    • Variance Criteria Letter

    You are responsible for verifying and accurately depicting all locations and dimensions of property lines; setback distances; and the location and width of streets, rights of way and easements.

    Preliminary Street Lighting Plan

    A preliminary street lighting plan may be required at the discretion of the Transportation Department for any project with public street frontage. If required, the plan is typically done early in the design review or preliminary plat/short plat process. The purpose of this preliminary plan is to determine if modifications to the street lighting system are required in order to meet the city’s design standards. Refer to the Transportation Design Manual and Street Lighting Design Guide (Appendix A).

    1. Provide a street light level analysis using AGi32 software to determine optimal street light locations that meet the city’s standards. Submit a digital AGi32 file for review.
    2. Provide a plan sheet showing the location(s) and type of pole and fixture for all lights included in the analysis. Also include all relevant features on this plan sheet, including but not limited to above and below ground utilities, building awnings/overhangs, street trees, crosswalks, driveways, etc.

    Where the city owns or will own the street lighting system (generally on arterial streets or downtown), the Preliminary Street Lighting Plan must be submitted by a Washington State-registered civil or electrical engineer experienced in street lighting design, at the developer’s request and expense.

    Where Puget Sound Energy (PSE) owns or will own the street lighting system (generally on local streets), the preliminary street lighting plan must be submitted to the city by PSE at the developer’s request and expense.

    Street Lighting Plan

    A complete street lighting plan may be required for all projects with public street frontage requiring new street lights or at the discretion of the Transportation Department. The street lighting plan will provide required details for construction of the street lighting system and be part of the approved engineering plan. Refer to the Transportation Design Manual and Street Lighting Design Guide (Appendix A).

    1. Show new and existing luminaries, their stations, installation details, contactor cabinet or the connections to an existing contactor cabinet, conduit, wire, and any adjacent existing luminaires as necessary to complete the electrical system. Show in half tone all relevant proposed and existing features, including but not limited to above and below ground utilities, building awnings/overhangs, street trees, crosswalks and driveways.
    2. Include detailed voltage drop calculations along with illumination calculations and luminary photometrics. Voltage drop calculations should include all lights on affected circuits.
    3. All work must conform to the City of Bellevue’s standard plans and specifications.
    4. Provide AGi32 digital file with CAD base as background.

    Where Puget Sound Energy (PSE) owns or will own the street lighting system (generally on local streets), a PSE construction drawing (for their own crew’s installation) must be submitted to the city by PSE at the developer’s request and expense. This plan must clearly state pole locations, pole type and height, luminaire arm type and length, luminaire type, and wattage. PSE must apply for all required permits prior to beginning work and will install the equipment.

    Contact

    Right of Way Division
    Telephone
    425-452-4189
    Email
    rightofwayuse@bellevuewa.gov

    Reasonable Accommodation

    For alternate formats, interpreters, or reasonable modification requests please phone at least 48 hours in advance 425-452-6800 (voice) or email servicefirst@bellevuewa.gov. For complaints regarding modifications, contact the City of Bellevue ADA, Title VI, and Equal Opportunity Officer at ADATitleVI@bellevuewa.gov.

    City of Bellevue sealCity of Bellevue, WA

    • 450 110th Avenue NE
    • Bellevue, WA 98004
    • Directions to City Hall
    • 425-452-6800
    • servicefirst@bellevuewa.gov
    • Contact Us / City Directory
    • Monday - Friday 8 a.m. - 4 p.m.

    Footer Menu Contacts

    • MyBellevue Customer Assistance
    • Careers
    • ADA/Title VI Notices

    Languages

    • English
    • Español
    • 简体中文
    • 繁體中文
    • 日本語
    • 한국어
    • Pусский
    • Tiếng Việt

    Request a Translation

    • Request a Translation
    • اطلب ترجمة
    • 申请翻译
    • 要求翻譯
    • अनुवाद का अनुरोध करें
    • 翻訳をリクエストする
    • 번역 요청
    • درخواست ترجمه
    • ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ
    • Запрос на перевод
    • Solicitud de traducción
    • అనువాదం అడగండి
    • ترجمےکے لئے ایک درخواست
    • Yêu cầu bản dịch
    • ትርጉም መጠየቅ

    Social Media

    © 2024 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map