The documents contained within these pages are generally dated from after the Sound Transit (ST2) ballot measure passed in 2008 through 2013 when the first Memorandum of Understanding (MOU) between the City and Sound Transit was approved.
Header Image
Over the years, preparing for East Link light rail has generated a wealth of presentations, letters and studies; particularly for the six stations (and associated guideway tracks) that are being built in the City of Bellevue.
The documents contained within these pages are generally dated from after the Sound Transit (ST2) ballot measure passed in 2008 through 2013 when the first Memorandum of Understanding (MOU) between the City and Sound Transit was approved.
The documents contained within these pages are generally dated from after the Sound Transit (ST2) ballot measure passed in 2008 through 2013 when the first Memorandum of Understanding (MOU) between the City and Sound Transit was approved.