Skip to main content

City Hall closed for Presidents Day

City Hall and other city facilities will be closed on Monday, Feb. 16, for Presidents Day.

Online Services Survey

We're looking to improve our online services, from utility payments to community engagement, and we want to hear from you. Take a short survey about the city’s online services. Open through 5 p.m., Friday, Feb. 20, the survey is available in multiple languages.

Planned Water Shutdown Thursday, Feb. 19

Bellevue Utilities has scheduled a planned water service shutdown impacting up to 75 homes in the Somerset neighborhood on Thursday, Feb 19, 8 a.m. – 4 p.m. Please see the map of impacted homes and additional details on this maintenance shutdown at www.BellevueWa.gov/water

Bellevue home
  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks and Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • ADA and Language Access Resources
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
City of Bellevue, WA Utilities
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt

2018 Surface Water Engineering Standard Details

Breadcrumb

  1. Home
  2. City Government
  3. Departments
  4. Utilities
  5. Utilities Projects and Standards
  6. Utilities Codes and Standards
  7. Surface Water Engineering Standards
Utilities Services

How may I help you?

This is an artificial-intelligence (AI) chatbot designed to provide general information about various city topics. If you are having an emergency of any kind, please call 911 immediately. The chatbot is still learning about all of our services and may occasionally provide an incorrect answer.

Give Feedback
  • Print
(Opens in a new window) (Opens in a new window) (Opens in a new window)
Copied to clipboard

Surface Water Engineering Standards

  • 2026 Details
  • 2025 Details
  • 2024 Details
  • 2023 Details
  • 2022 Details
  • 2021 Details
  • 2020 Details
  • 2019 Details
  • 2018 Details
  • 2017 Details
  • 2016 Details
  • 2015 Details
  • Previous and 1998 Details

D-1 CONCRETE INLET

D-2 CATCH BASIN TYPE 1 

D-3 CATCH BASIN TYPE 1-L 

D-3A CATCH BASIN TYPE 1-P 

D-4 CATCH BASIN TYPE 2 

D-5 LADDER, STEP, AND TOP SLAB, DETAILS 

D-6 VANED GRATE 

D-7 PARKING LOT/AREA GRATE 

D-8 SOLID COVER 

D-9 STANDARD FRAME INSTALLATION 

D-10 THROUGH-CURB INLET FRAME 

D-11 THROUGH-CURB INLET FRAME INSTALLATION 

D-12 FRAME & GRATE FOR EXISTING ROLLED CURB 

D-13 EXISTING ROLLED CURB FRAME & GRATE INSTALLATION 

D-14 GRATE FOR EXISTING ROLLED CURB INSTALLATION 

D-15 CONVERSION RISER FOR CATCH BASIN TYPE 1-L 

D-16 AREA INLET 

D-17 MANHOLE TYPE 1 

D-18 MANHOLE TYPE 2 

D-19 MANHOLE TYPE 3 

D-20 MANHOLE TYPE 4 

D-2124” MANHOLE RING AND COVER 

D-22 24” BOLT-LOCKING MANHOLE RING & COVER 

D-23 MANHOLE/CATCH BASIN ADJUSTMENT DETAIL 

D-24 CORRUGATED METAL MANHOLE 

D-25 TYPICAL TRENCH DETAIL 

D25A PIPE ZONE BEDDING 

D-26 FLOW CONTROL STRUCTURE 

D-27 PIVOTING SHEAR GATE DETAIL 

D-28 SCREW-TYPE SHEAR GATE 

D-29 SHEAR GATE VALVE VAULT 

D-29A VALVE BOX AND EXTENSIONINSTALLATION 

D-29B VALVE OPERATING EXTENSION 

D-30 DRY DETENTION POND DRY DETENTION POND 

D-30A WATER QUALITY POND 

D-31 DETENTION PIPE 

D-32 DETENTION VAULT DETENTION VAULT
 

D-33 TAPPING TEES FOR DRAIN PIPE 

D-34 BEVELED END PIPE SECTION 

D-35 ROCK-LINED DITCHES 

D-36 GRASS-LINED DITCH 

D-37 SIDEWALK DRAIN 

D-38 ENERGY DISSIPATOR 

D-39 DEBRIS CAGE 

D-40 (NOT USED)

D-41 (NOT USED)

D-42 SPILL CONTROL (SC) SEPARATOR – TYPE 1 

D-43 SPILL CONTROL (SC) SEPARATOR – TYPE 2 

D-43A SPILL CONTROL (SC) SEPARATOR –TYPE 3 

D-44 DRAINAGE FACILITY MAINTENANCE ACCESS 

D-45 GATE/BOLLARD PLACEMENT 

D-46 (NOT USED)

D-47 RUNOFF TREATMENT VAULT (WET VAULT) 

D-48 COMBINED VAULT (DETENTION AND RUNOFF TREATMENT) 

D-49 SUMP WITH RISER PIPE 

D-50 (NOT USED)

D-51 TRAFFIC BEARING ACCESS FOR  CORRUGATED METAL MANHOLE 

D-52 CLEAN OUT TO GRADE 

D-53 TRASH RACK/DEBRIS BARRIER 

D-54S OIL/CEMENT PIPE ANCHORS 

D-55 (NOT USED)

D-56 CASING INSTALLATION 

D-57 PIPE STAKE ANCHOR ASSEMBLY 

D-58 DRIVEWAY CULVERT 

D-59 ROCK PROTECTION OUTFALL 

D-60 BIRD CAGE TRASH RACK STRUCTURE 

NDP-1 AMENDED SOILS 

NDP-2 BIORETENTION CELL 

NDP-3 BIORETENTION SWALE 

NDP-4 BIORETENTION PLANTER –WITH UNDERDRAIN 

NDP-4A BIORETENTION PLANTER – INFILTRATION 

NDP-5 BIORETENTION PLANTER – UNDERDRAIN  

AND OVERFLOW CONNECTED TO STORM SYSTEM 

NDP-6 BIORETENTION OVERFLOW WITH CONVEYANCE FURROW 

NDP-7 BIORETENTION OVERFLOW WITH PIPE CULVERT 

NDP-8 OVERFLOW CONFIGURATIONS FOR BIORETENTION 

NDP-9 OBSERVATION PORT FOR BIORETENTION 

NDP-10 DRAIN CURBCUT OPENING FOR BIORETENTION 

NDP-11 POROUS ASPHALT OR PERVIOUS CONCRETE  PAVEMENT SECTION 

NPD-11A PERVIOUS ASPHALT OR CONCRETEPAVEMENT SECTION 

NDP-12 PERMEABLE PAVER SYSTEMS   PERMEABLE PAVER SYSTEMS  

NDP-13 PERMEABLE PAVEMENT SIDEWALK IN PLANTING STRIP 

NDP-14 PERMEABLE PAVEMENT SIDEWALK 

NDP-15 CHECK DAM AND INTERCEPTOR FOR  PERVIOUS PAVEMENT ON SLOPES 

NDP-16 OBSERVATION PORT FOR PERMEABLE PAVEMENT 

NDP-17 OBSERVATION PORT COVERS FOR PERMEABLE PAVEMENT 

NDP-18 RAIN RECYCLING SYSTEM – RAIN BARREL 

NDP-19 RAIN RECYCLING SYSTEM – CISTERN 

NDP-20 POP-UP DRAINAGE EMITTER 

NDP-21 REVERSE SLOPE SIDEWALK 

NDP-22 ROOF DOWNSPOUT DISPERSAL TRENCH DETAIL 

NDP-23 ROOF DOWNSPOUT INFILTRATION TRENCH 

NDP-24 (NOT USED)

NDP-25 RESIDENTIAL ROOF DOWNSPOUT PERFORATED  PIPE CONNECTION 

 

Reasonable Accommodation

For alternate formats, interpreters, or reasonable modification requests please phone at least 48 hours in advance 425-452-6800 (voice) or email servicefirst@bellevuewa.gov. For complaints regarding modifications, contact the City of Bellevue ADA, Title VI, and Equal Opportunity Officer at ADATitleVI@bellevuewa.gov.

City of Bellevue sealCity of Bellevue, WA

  • 450 110th Avenue NE
  • Bellevue, WA 98004
  • Directions to City Hall
  • 425-452-6800
  • servicefirst@bellevuewa.gov
  • Contact Us / City Directory
  • Monday - Friday 8 a.m. - 4 p.m.

Footer Menu Contacts

  • MyBellevue Customer Assistance
  • Careers
  • ADA/Title VI Notices

Languages

  • English
  • Español
  • 简体中文
  • 繁體中文
  • 日本語
  • 한국어
  • Pусский
  • Tiếng Việt

Request a Translation

  • Request a Translation
  • اطلب ترجمة
  • 申请翻译
  • 要求翻譯
  • अनुवाद का अनुरोध करें
  • 翻訳をリクエストする
  • 번역 요청
  • درخواست ترجمه
  • ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ
  • Запрос на перевод
  • Solicitud de traducción
  • అనువాదం అడగండి
  • ترجمےکے لئے ایک درخواست
  • Yêu cầu bản dịch
  • ትርጉም መጠየቅ

Social Media

© 2024 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map | AI Policy