All work involving underground fire service mains, fire department connections and isolation valves. (FD)

You must apply for this permit online through MyBuildingPermit

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

  • Bill To Form
  • Manufacturer Equipment Sheets
  • Shop Drawing
    • All drawings must be to scale. All equipment must be labeled and a corresponding legend is required.
  • Site Plan

Additional Documents

These items may be required during plan review, as determined by the scope of your project.

  • Preapplication Conference Letter 
  • Response Letter to Previous Comments 

Fees and Timelines

Contact

Permit Center
Telephone
Hours
In-person Permit Center services are available Monday to Thursday 10 a.m. - 3 p.m.

The Permit Center will be open on Friday from 10 a.m. - 3 p.m., although customers visiting City Hall may be served remotely by permitting staff.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.