For clearing and grading associated with infrastructure construction on an approved preliminary plat, short plat, or planned unit development. Infrastructure includes roads and streets, water, sewer, storm drainage, dry utilities and plat landscaping. (GE)
Apply for this permit online through MyBuildingPermit.
Required Documents
The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the document waiver form in place of the required document.
- Bill To Form
- Boundary and Topographic Survey
- CSWPPP Long Form
- Drainage Plan
- Final Landscape Plan
- Geotechnical Report
- Grading Plan
- Road Plan
- Site Plan B
- Stream Typing Report
- Street Lighting Plan
- Tree Hazard Declaration Form
- Wetland Report
Additional Documents
These items may be required during plan review, as determined by the scope of your project.
- CSWPPP Short Form for Small Construction Projects
- CSWPPP Requirements
- Right of Way Use Permit
- Stormwater Permitting for Construction Sites
- Utility Extension Agreement