This permit is for commercial and multifamily clearing and grading projects that include the following: (GD) 

  • Clearing and grading associated with a building permit.
  • Removal and installation of underground storage tanks.
  • Major changes to nonresidential landscaping, walls or rockeries that don’t require a building permit; roadway and utility installations.
  • Removal of hazardous trees and other permitted clearing and grading activities in critical areas that require SEPA review.

The permit includes a Land Use Exemption, if required, and may or may not include SEPA.

Apply for this permit online through MyBuildingPermit

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

Additional Documents

These items may be required during plan review, as determined by the scope of your project.

Fees and Timelines

Contact

Permit Center
Telephone
Hours
In-person Permit Center services are available Monday to Thursday 10 a.m. - 3 p.m.

The Permit Center will be open on Friday from 10 a.m. - 3 p.m., although customers visiting City Hall may be served remotely by permitting staff.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.