Franchise Utility Right of Way Permit

This permit may be issued for use of the right of way for franchise utility work and those operating under an existing Right of Way Use Agreement. (TJ)

CALL (1-800-424-5555) 48 hours before you dig. “It’s the law.” RCW 19.122

Apply for this permit online through MyBuildingPermit

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

Additional Documents

These items may be required during plan review, as determined by the scope of your project.

Fees and Timelines