Skip to main content
Bellevue home
  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks & Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • ADA and Language Access Resources
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
    • Local Service Agencies
City of Bellevue, WA Utilities
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt

2024 Water Engineering Standard Details

Breadcrumb

  1. Home
  2. City Government
  3. Departments
  4. Utilities
  5. Utilities Projects and Standards
  6. Utilities Codes and Standards
  7. Water Engineering Standards
Utilities Services

How may I help you?

This is an artificial-intelligence (AI) chatbot designed to provide general information about various city topics. If you are having an emergency of any kind, please call 911 immediately. The chatbot is still learning about all of our services and may occasionally provide an incorrect answer.

Give Feedback
  • Copied to clipboard

    Water Engineering Standards

    • 2025 Details
    • 2024 Details
    • 2023 Details
    • 2022 Details
    • 2021 Details
    • 2020 Details
    • 2019 Details
    • 2018 Details
    • 2017 Details
    • 2016 Details
    • 2015 Details
    • Previous Years Details

    2024 Water Engineering Standards

    Individual Details

    W-1: Concrete Blocking

    W-2: Vertical Blocking with Restrained Joints for New Lines

    W-3: Vertical Blocking for Connecting to Existing Main

    W-4: Concrete Slope Anchor Detail

    W-5: Pipe Clamp and Anchor Rods for Concrete Blocking

    W-6: Typical Trench Detail

    W-7: Casing Installation

    W-8: Typical A.C. Water Main Crossing Replacement Detail

    W-9: Filling New Water Mains

    W-10: Tapping Tees

    W-11: Valve Box Installation

    W-12: Valve Operating Extension

    W-13: Fire Hydrant Assembly

    W-14: Fire Hydrant Guard Post & Valve Marker Post

    W-15: 2in Blow-Off Assembly

    W-16: 1in Air Release Valve Assembly

    W-17: Standard Pressure Reducing Station

    W-18: Typical P.R.V. Schematic

    W-19: Pressure Reducing Station Access Ladder and Pressure Relief Drain

    W-20: Individual Pressure Reducing Valve Assembly (Residential)

    W-21: Individual Pressure Reducing Valve Assembly (Multi-Family or Commercial)

    W-22: Individual Pressure Reducing Valve Assembly with Pressure Relief (Multi-Family or Commerce)

    W-23: 1in x 1in Water Service or Domestic Irrigation Service (Horizontal Meter Setter)

    W-24: 1in x 1in Water Service or Domestic Irrigation Service (Vertical Meter Setter)

    W-25: 1 1⁄2in Domestic Water and or Fire Service

    W-26: 1 1⁄2in Domestic Water Service (Commercial and Multi-Family)

    W-27: 1 1⁄2 in Irrigation Water Service

    W-28: 1 1⁄2in Irrigation Water Service (Commercial and Multi-Family)

    W-29: 2in Domestic Water and or Fire Service

    W-30: 2in Domestic Water Service (Commercial and Multi-Family)

    W-31: 2in Irrigation Water Service

    W-32: 2in Irrigation or Fire Sprinkler Water Service (Commercial and Multi-Family)

    W-33A: 3in Domestic Meter Installation

    W-33B: 3in Domestic Meter Materials List and Vault Requirements

    W-33C: 4in Domestic Meter Installation

    W-33D: 4in Domestic Meter Materials List and Vault Requirements

    W-33E: 6in Domestic Meter Installation

    W-33F: 6in Domestic Meter Materials List and Vault Requirements

    W-34A: 8in Domestic Meter Installation

    W-34B: 8in Domestic Meter Materials List and Vault Requirements

    W-35: 3in to 6in Irrigation Meter Installation

    W-36: 1in to 2in Double Check Valve Assembly for Irrigation Systems (Outside Installation)

    W-38: Double Check Valve Assembly (Inside Installation)

    W-39: Outside DCVA Installation for 1-1_2in and 2in Commercial Fire Sprinkler Systems

    W-40: Outside DCVA Installation for 3in and Larger Commercial Fire Sprinkler Systems

    W-41: 1-1/2in and 2in Domestic Double Check Valve Assembly for Continuous Supply (Outside Installation)

    W-42: 3in to 6in Domestic Double Check Valve Assembly for Continuous Supply (Outside Installation)

    W-43: 8in to 10in Domestic Double Check Valve Assembly for Continuous Supply (Outside Installation)

    W-44: 3in to 10in Double Check Valve Assembly for Domestic and Irrigation Services (Outside Installation)

    W-45: 3in to 10in Double Check Detector Assembly for Fire Sprinkler Systems (Outside Installation)

    W-46A: Reduced Pressure Backflow Assembly for Domestic and Irrigation Services (Outside Installation)

    W-46B: 3in to 10in Reduced Pressure Backflow Assembly for Domestic and Irrigation Services (Buried Vault Installation)

    W-47: 3in to 10in Reduced Pressure Detector Assembly for Fire Sprinkler System (Outside Installation)

    W-48: Reduced Pressure Backflow Assembly (Inside Installation)

    W-49: (Not Used)

    W-50: Requirements for FDC and Check Valve Routed Through Backflow Assembly Vault-2

    W-51: (Not Used)

    W-52: (Not Used)

    W-53: Project Sign Detail

    W-54: Roadway Clearances for Above Ground Appurtenances

    W-55: Fireline Valve Marker

    W-56: Thrust Block Adjacent to Vault

    Reasonable Accommodation

    For alternate formats, interpreters, or reasonable modification requests please phone at least 48 hours in advance 425-452-6800 (voice) or email servicefirst@bellevuewa.gov. For complaints regarding modifications, contact the City of Bellevue ADA, Title VI, and Equal Opportunity Officer at ADATitleVI@bellevuewa.gov.

    City of Bellevue sealCity of Bellevue, WA

    • 450 110th Avenue NE
    • Bellevue, WA 98004
    • Directions to City Hall
    • 425-452-6800
    • servicefirst@bellevuewa.gov
    • Contact Us / City Directory
    • Monday - Friday 8 a.m. - 4 p.m.

    Footer Menu Contacts

    • MyBellevue Customer Assistance
    • Careers
    • ADA/Title VI Notices

    Languages

    • English
    • Español
    • 简体中文
    • 繁體中文
    • 日本語
    • 한국어
    • Pусский
    • Tiếng Việt

    Request a Translation

    • Request a Translation
    • اطلب ترجمة
    • 申请翻译
    • 要求翻譯
    • अनुवाद का अनुरोध करें
    • 翻訳をリクエストする
    • 번역 요청
    • درخواست ترجمه
    • ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ
    • Запрос на перевод
    • Solicitud de traducción
    • అనువాదం అడగండి
    • ترجمےکے لئے ایک درخواست
    • Yêu cầu bản dịch
    • ትርጉም መጠየቅ

    Social Media

    © 2024 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map