The City of Bellevue is working on three projects to connect walkers, rollers and bikers to the Eastrail at NE 12th Street, Main Street and the crossing with the Mountains to Sound Greenway Trail.
Mountains to Sound Greenway Trail Connection to Eastrail
King County Parks is developing the Eastrail through Bellevue. The segment that crosses I-90 will use the existing steel railroad bridge and is currently in design for conversion to a trail, with opening anticipated in 2031. Included in the King County project will be a ramp connection to SE 32nd Street, a low-volume, dead end city street.
The city’s Eastrail to Mountains to Sound Regional Trails Connection project will:
- construct improvements along the south side of SE 32nd Street to enhance conditions for people walking
- add a rectangular rapid flashing beacon (RRFB) crosswalk at 118th Ave SE
- construct a 12-14-foot-wide shared use path and a 5-foot-wide planter strip on the west side of 118th Avenue SE between SE 32nd Street and I-90/Mountains to Sound Greenway trail.
Funding
The estimated project cost is $6.2 million. The city received a $2.5 million grant from the Puget Sound Regional Council, with the remaining balance coming from city transportation and parks capital funds.
Project Timeline
- Summer 2027 Anticipated start of construction
- 2026 Complete design work and permitting.