Installation of a new or modification of an existing wireless communication facility (includes associated equipment) on private or public property or a temporary facility. May include clearing & grading review. Requires building plan review. May require a separate Land Use Exemption, Administrative Conditional Use or Conditional Use and/or Electrical Permit. May or may not include SEPA. (CD)
Apply for this permit online through MyBuildingPermit.
Required Documents
The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.
- Bill To Form
- Criteria Compliance Narrative
- CSWPPP Long Form
- Deployment Plan
- Dispersal Map
- Letter of Certification
- Letter of Compliance with FCC RF Standards
- Owner Authorization
- Photo Simulation
- Service Coverage Area Map
- Site Plan A
- Structural Notes
- Visual Screening Method and Materials
Additional Documents
- Environmental Checklist
- WCF Dimensions