Skip to main content

Bellevue home

  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks & Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • Resident Services
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Languages
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
    • Local Service Agencies
    • Volunteering
City of Bellevue, WA Development Services
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt
bellevue downtown.jpg

MyBellevue Chatbot

Breadcrumb

  1. Home
  2. City Government
  3. Departments
  4. Development Services
  5. Permits
  6. Commercial Building Permits
  7. Major Commercial Project Permit

    Commercial Building Permits

    • Detention Vault for Stormwater
    • Major Commercial Project
    • Medium Commercial Project
    • Minor Commercial Project
    • Portable Building Foundation
    • Shoring Permit
    • Tenant Improvement

    Major Commercial Project Permit

    Header Image
    bellevue downtown.jpg

    Permit for construction of a new commercial or multifamily building or addition, 4,000 square feet or more, which does not require SEPA review or SEPA review has been done under a prior land use approval. The permit includes demolition work when appropriate. (BB)

    When applying for a Major Project Building Permit, you must apply for a Clearing & Grading Permit (GD) and submit a Utilities Extension Agreement (UE) at the same time or before submittal of the building permit. A Smoke Control Permit (FH) and Conceptual Smoke Control Submittal document must be approved prior to submittal of the building permit.

    Apply for this permit online through MyBuildingPermit. 

    Required Documents

    The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

    • Addressing Site Plan
    • Architectural Plan
    • Bill-to Form
    • Boundary and Topographic Survey
    • Civil Plan
      • Erosion and Sediment Control (ESC) and road plans may be combined into a single plan.
    • Disconnection of Water/Sewer Service Form
    • Energy Code Sheet/Envelope Summary (WSEC Compliance Forms)
    • Exterior Lighting Plan
    • Geotechnical Report
    • Landscape Plan
    • Pedestrian Protection Plan
    • Preapplication Conference Letter (if conference was held)
    • Site Plan B
    • Structural or Lateral Calculations
    • Structural Plan 
    • Summary Statement of Special Inspections Form

    For assistance with electronic plan submittals, refer to Requirements for Electronic Plans

    Additional Documents

    These items may be required during plan review, as determined by the scope of your project.

    • King County Health Department Approval
      • Required for projects that involve restaurants, delicatessens, commercial kitchens, hospitals, nursing homes, and public and semi-public pools and spas or if the building is served by a septic system. During review, submit your approval in the form of a letter or a stamped plan from the King County Health Department.
    • Multifamily Checklist
    • Previous Environmental Review
    • Road Plan
    • School District Impact Fee Form
      • Issaquah and Renton School Districts
    • Street Lighting Plan

    Fees and Timelines

    • Major Project Permit Fees
    • Permit Fee Estimator
    • Permit Processing Timelines

    Contact

    Building Review
    Telephone
    425-452-4121
    Email
    buildingreview@bellevuewa.gov

    Contact

    Permit Center
    Telephone
    425-452-4898
    Email
    permits@bellevuewa.gov
    Business Hours
    8 a.m to 4 p.m Weekdays
    10 a.m. to 4 p.m. Wednesdays

    City of Bellevue sealCity of Bellevue, WA

    • 450 110th Avenue NE
    • Bellevue, WA 98004
    • Directions to City Hall
    • Monday-Friday 8 a.m.-4 p.m.

    Footer Menu Contacts

    • 425-452-6800
    • servicefirst@bellevuewa.gov
    • MyBellevue Customer Assistance
    • Contact Us / Employee Directory
    • Careers
    • ADA/Title VI Notices

    Languages

    • English
    • Español
    • 简体中文
    • 繁體中文
    • 日本語
    • 한국어
    • Pусский
    • Tiếng Việt

    About Bellevue

    All America City shield logo for Bellevue

    Learn more about us

    Social Media

    Tweets by bellevuewa

    Footer Menu Social Media

    © 2019 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map