Required for new or upgraded water services, city-installed water meter or full service installation. (UC)
Apply for this permit online through MyBuildingPermit.
Required Documents
The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.
Additional Documents
These items may be required during plan review, as determined by the scope of your project.
- Recorded Easement
- Right of Way Use Permit
- Site Plan A