Header Image
Project Banner 6-20-17.jpg

Bellevue offers training to applicants for stormwater permits regarding changes to Bellevue's surface water engineering standards. The training will provide an overview of the 2017 standards -- revised since the city adopted a 2014 amendment to the state Department of Ecology Stormwater Management Manual for Western Washington. The training will highlight the most significant changes, including low-impact development requirements.

The surface water engineering standards now include a site assessment and planning packet that will guide you through the information needed to prepare a storm report. The engineering standards also include a link to city GIS map showing areas feasible for infiltration type best management practices. Bellevue has determined these areas based upon infiltration infeasibility criteria contained in the 2014 amendment of the Department of Ecology 2012 Stormwater Management Manual. The draft standards will be available online after Oct. 3, 2016.

Dates and Locations:

Two identical training sessions are being offered at City Hall (450 110th Ave. NE):

  • Oct. 11, 9-10:30 a.m., Conference Room 1E-108 (40 seats available)
  • Oct. 13, 9-10:30 a.m., Council Chamber (118 seats available)

Reserve a Seat for the Training:

Please register ahead of time so we can prepare adequate training materials. Call 425-452- 6977 or email utilengadmin@bellevuewa.gov to reserve a seat.

Questions:

If you have questions regarding the surface water engineering standards update, please contact Rick Watson at rwatson@bellevuewa.gov.

Parking:

A limited amount of parking is available at City Hall. Parking in the visitor parking garage is available on a “first come, first served” basis and parking availability is not guaranteed. There are other pay parking lots in the immediate vicinity.