移至主內容
Bellevue home
  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks and Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • ADA and Language Access Resources
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
City of Bellevue, WA Transportation
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt

124th Avenue NE Corridor

導航連結

  1. 首頁
bellevue home

How may I help you?

This is an artificial-intelligence (AI) chatbot designed to provide general information about various city topics. If you are having an emergency of any kind, please call 911 immediately. The chatbot is still learning about all of our services and may occasionally provide an incorrect answer.

Give Feedback
  • Increase Text Size
  • Decrease Text Size
  • Print
Opens in a new window Opens in a new window Opens in a new window
Copied to clipboard

Translated Pages Navigation

  • 歡迎
Header Image
Bel-Red Character Sketch - 130th Ave.jpg

The transformation of the 124th Avenue Corridor between Northeast Eighth Street and Northup Way continues at a steady pace. These improvements will enhance access and circulation for cars, transit, freight, pedestrians and bicycles between downtown, Wilburton and BelRed.

The transformation comes from the need to accommodate future growth and new land uses in the area, envisioned in the BelRed Subarea Plan. Project design, implementation and cost-sharing has been coordinated with Sound Transit’s Link 2 light rail line, which will begin limited service in 2024.

124th Avenue Corridor Improvement Vicinity Map

Outreach Materials

  • View aerial footage of the 124th Avenue Northeast Corridor (May 2020)
  • Access Bellevue booklet (May 2020)

Project Status

Corridor improvements are being built with four distinct project areas with some projects under construction while others have been completed.

Projects under construction

  • Construction began January 2022 - Northeast 12th Street to Northeast Spring Boulevard: This segment will widen 124th Avenue Northeast to five lanes, build a pathway for bicyclists and pedestrians, improve street lighting, modify traffic operations, restore the roadway and more. Project construction began in January 2022 and is anticipated to be completed by summer 2023.
  • Construction planned begins March 2023 - Ichigo Way to Northup Way: This segment will widen and re-profile the roadway to five lanes, build a multipurpose path between the future Northeast 16th Street and Ichigo Way, install sidewalk, replace an existing pipe with a fish-passable culvert, improve street lighting and more. The project is anticipated to be completed by 2024.

Completed projects

  • Northeast 8th to 12th Street: This segment installed a mid-block flashing beacon crossing at Northeast 10th Place and curb ramps, improved lighting and restored the roadway. The work was completed in 2021.
  • Northeast Spring Boulevard to Ichigo Way: This segment raised and widened the roadway to five lanes, built a bridge for the light rail undercrossing, installed sidewalk and a new traffic light the future Northeast 16th Street and restored the roadway. The work was completed in July 2021.
  • Ichigo Way to Northup Way - monopole replacement project: This part of the project included the replacement of two Seattle City Light electrical towers with skinnier monopoles. The work was completed in February 2021 and was captured in a time-lapse video.  
Alerts
Receive email or text updates on this project.
Subscribe

Transportation

Marina Arakelyan, PE
Project Manager

電話
425-452-4632
電子郵件
marakelyan@bellevuewa.gov
社群媒體

合理便利措施

如需其他格式、口譯者或合理的便利請求,請至少提前 48 小時撥電 425-452-6800 (語音)或發送電郵至 servicefirst@bellevuewa.gov。如有針對便利措施的投訴,請發送電郵至 ADATitleVI@bellevuewa.gov 聯絡 Bellevue ADA,第 VI 章及平等機會官。

City of Bellevue sealCity of Bellevue, WA

  • 450 110th Avenue NE
  • Bellevue, WA 98004
  • 前往市政廳的路線
  • 星期一至星期五上午 8 點 - 下午 4 點

Footer Menu Contacts

  • MyBellevue 客戶協助
  • 加入我們
  • ADA/第六章通知

語言

  • English
  • Español
  • 简体中文
  • 繁體中文
  • 日本語
  • 한국어
  • Pусский
  • Tiếng Việt

要求翻譯

  • Request a Translation
  • اطلب ترجمة
  • 申请翻译
  • 要求翻譯
  • अनुवाद का अनुरोध करें
  • 翻訳をリクエストする
  • 번역 요청
  • درخواست ترجمه
  • ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ
  • Запрос на перевод
  • Solicitud de traducción
  • అనువాదం అడగండి
  • ترجمےکے لئے ایک درخواست
  • Yêu cầu bản dịch
  • ትርጉም መጠየቅ

社群媒體

© 2024 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map | AI Policy