Northwest Bellevue voting phase is complete
The votes are in!
Thanks to those Northwest Bellevue residents for your participation in the Neighborhood Enhancement Program.
Four new capital improvement projects will be funded from the $380,000 Northwest Bellevue NEP allotted budget, thanks to the 350 ballots that were returned.
1. Bellevue Way NE Landscape Enhancement
Bellevue Way NE, between NE 12th Street and NE 24th Street
This project will involve landscape renovation and beautification of Streetscape beds on the West side of Bellevue Way. Work will focus on removing existing turfgrass in curbside beds, and the soil and irrigation will be improved to support new landscaping. Plants will be chosen specifically to avoid sight-distance problems and integrate with previous phases of renovation. Opportunities for additional renovation in this section will be considered where practical.
Project Manager: Laura McKee (425-452-4108); lmckee@bellevuewa.gov
2. 92nd Ave NE Invasive Plant Removal
92nd Ave NE at NE 8th Street to Clyde Hill City Limit
This project will involve a one-time removal of invasive vegetation along the East side of 92nd Ave NE in the Right of Way. Project will remove invasive species such as ivy, blackberry and holly, remove accumulated debris, mulch the exposed areas and support 2 years of vegetation suppression.
Project Manager: Laura McKee (425-452-4108); lmckee@bellevuewa.gov
3. Meydenbauer Area Wayfinding Signage
Meydenbauer Bay Park area
This project will install pedestrian and bicycle wayfinding signs and posts to Meydenbauer Bay Park and to Downtown Park.
Project Manager: Brittany Quan (425-452-4631); bquan@bellevuewa.gov
4. Vuecrest Utility Box Wrap
At the mini roundabout located at the northwest corner of Belfair Lane and 100th Ave NE
This project will wrap the existing silver utility box with custom artwork that draws inspiration from vintage Vuecrest promotional materials. This project will include hiring a local artist, managed by the City of Bellevue’s Arts Program, to develop designs for the utility box. Existing vintage Vuecrest promotional materials will be provided to the artist for their use in creating custom designs
Project Manager: Manette Stamm (425-452-4064); mstamm@bellevuewa.gov
A Northwest Bellevue NEP Newsletter was mailed to each household in your area with complete voting results.
We’d love to hear your thoughts on the NEP process. Please return the postage paid evaluation card included with your Announcement Newsletter or submit your comments online here: evaluation form link. Deadline for submission is Monday, Dec 29.
The Northwest Bellevue NEP kicked off in March 2025 with 94 resident-identified project ideas submitted. Those projects were then reviewed for accessibility, feasibility, cost, timeliness, and maintainability to determine which were eligible to become ballot projects. 9 projects were included on the ballot and voted on by area residents. The top project receiving votes (listed above) will be installed over the next 3-4 years.
Northwest Bellevue NEP projects selected by residents in 2018
Two capital improvement projects will be funded from the $315,000 Northwest Bellevue allotted budget.
1. Bellevue Way Landscape Enhancement
This project will provide for the beautification of the Bellevue Way streetscape on the west side of the boulevard that currently consists of common turf between curb and sidewalk and a mix of aging shrubs in right-of-way back of sidewalk. This project will remove the water inefficient turf, improve the soil and irrigation, and design and implement a landscape of plant combinations that will unify the streetscape of Northwest Bellevue. Opportunities on east side of Bellevue Way such as the Northtowne Park frontage will be researched for upgrades. Project completed: Spring 2025.
Project Manager: Laura McKee (425-452-4108); LMcKee@bellevuewa.gov
2. 100th Ave. NE and NE 18th St. Raised Intersection
This project will install a raised intersection at 100th Ave NE and NE 18th St to improve visibility of pedestrians crossing the street and encourage motorists to drive at a slower speed. The raised intersection will include high visibility school crosswalks to improve safety at this key connection point for students walking to and from schools located on 98th Ave NE. This improvement is part of the NW Bellevue Walkways and Safety Improvements project that will provide safe connections to schools on 98th Ave NE by constructing a multi-purpose path on the east side of 100th Ave NE, two raised crosswalks with RRFBs and two additional raised intersections on 100th Ave NE, and new sidewalks on NE 18th St, 98th Ave NE, and NE 21st St. Estimated Project completion: Spring 2026.
Project Manager: Benjamin Wright (425-452-2883); Bmwright@bellevuewa.gov
Process Materials & Resources
NW Bellevue NEP Project Announcement Newsletter November 2025
NW Bellevue NEP Voters Pamphlet- September 2025
NW Bellevue NEP Balloted Projects Boards (9)
September 18, 2025 NW Bellevue NEP Open House Presentation
NW Bellevue March 26 2025 Kickoff Meeting Presentation
NW Bellevue Neighborhood Area Map