跳转到主要内容
Bellevue home
  • Bellevue Home
  • City Government
    • Boards, Commissions and Committees
    • City Code, Resolutions and Ordinances
    • City Council
    • Communications
    • Departments
    • East Bellevue Community Council
    • Hot Topics and Initiatives
    • Public Records Requests
    • Sister Cities
  • Departments
    • City Attorney's Office
    • City Clerk's Office
    • City Manager's Office
    • Communications
    • Community Development
    • Development Services
    • Emergency Management
    • Finance & Asset Management
    • Fire
    • Human Resources
    • Information Technology
    • Parks & Community Services
    • Police
    • Transportation
    • Utilities
  • Discover Bellevue
    • About Us
    • Bellevue Television
    • City News
    • Things to Do
    • Arts in Bellevue
    • Parks and Trails
    • Economic Development
  • Doing Business
    • Building and Zoning
    • Doing Business in Bellevue
    • Doing Business with Bellevue
  • Public Safety
    • Police
    • Fire
    • Emergencies and Extreme Weather
    • Emergency Preparedness
    • Municipal Court
    • Neighborhood Traffic Safety
    • Probation
    • Public Defenders
  • Resident Resources
    • ADA and Language Access Resources
    • Customer Assistance
    • Conflict Assistance
    • Diversity Advantage
    • Neighborhoods
    • Newcomers Guide
    • Permits, Parking and Utilities
    • Volunteering
    • Local Service Agencies
City of Bellevue, WA City aims to repave 40 miles of roadway in 2019
English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt

City aims to repave 40 miles of roadway in 2019

面包屑

  1. City of Bellevue
  2. City News
bellevue home

How may I help you?

This is an artificial-intelligence (AI) chatbot designed to provide general information about various city topics. If you are having an emergency of any kind, please call 911 immediately. The chatbot is still learning about all of our services and may occasionally provide an incorrect answer.

Give Feedback
  • Copied to clipboard

    Translated Pages Navigation

    • 欢迎

    Published 四月 25 2019

    Repaving-Crew.jpg
    Header Image
    Aerial Skyline Banner.jpg

    Road construction season has kicked off in earnest, led by the city’s annual repaving effort.

    This year, approximately 40 lane miles of roadway are scheduled for resurfacing around the city, which includes work carried over from last year. The historical average is around 20 lane miles per year.

    In the Eastgate area, contractor Watson Asphalt Paving already has resumed projects it began in 2018. In a few weeks, Lakeside Industries is anticipated to begin improvements programmed for 2019, mostly in north Bellevue.

    In addition to restoring smooth roadway surfaces, other improvements will include:

    • Curb ramps: Crews will replace 69 older curb ramps and construct six new curb ramps, making it easier for people with disabilities to get around.
    • Sidewalks: Approximately 2,500 linear feet of sidewalk in poor condition will be rebuilt in the Tam O’Shanter neighborhood.
    • Bike lanes: More than 3.2 lane miles of new bike lanes will be added by restriping pavement after the repaving work is complete, a low-cost way to expand the city’s bicycle network. Another 1.3 lane miles of bike lanes will be enhanced by striping a buffer space between vehicle and bike lanes. These improvements are partially funded by the 2016 Neighborhood Safety, Connectivity and Congestion Levy.
    • What to expect: If your street is scheduled for repaving, you will be notified by signs along the roadway, as well as by door hangers when work is about to occur.

    Now in its 33rd year, the Pavement and Bridge Management Program (formerly called the Overlay Program) uses biennial pavement condition surveys and analysis systems to prioritize which streets and sidewalks should be repaved in a given year.

    This strategy saves money in the long run by avoiding the need for a complete roadway reconstruction, which can cost several times more than repaving. The program’s yearly budget, typically in the $5 to $7 million range, also covers bridge inspections and maintenance.

    Since 1990, more than 790 lane miles of roadway have been repaired or resurfaced as part of the program. Throughout the city, there are approximately 1,100 lane miles of asphalt roads.

    City of Bellevue sealCity of Bellevue, WA

    • 450 110th Avenue NE
    • Bellevue, WA 98004
    • 前往市政厅的路线
    • 周一至周五上午 8 点至下午 4 点

    Footer Menu Contacts

    • MyBellevue 客户协助
    • 招贤纳士
    • ADA/第六章通知

    语言

    • English
    • Español
    • 简体中文
    • 繁體中文
    • 日本語
    • 한국어
    • Pусский
    • Tiếng Việt

    申请翻译

    • Request a Translation
    • اطلب ترجمة
    • 申请翻译
    • 要求翻譯
    • अनुवाद का अनुरोध करें
    • 翻訳をリクエストする
    • 번역 요청
    • درخواست ترجمه
    • ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ
    • Запрос на перевод
    • Solicitud de traducción
    • అనువాదం అడగండి
    • ترجمےکے لئے ایک درخواست
    • Yêu cầu bản dịch
    • ትርጉም መጠየቅ

    社交媒体

    © 2024 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map