Notice of Public Meeting
Bellevue City Hall, Conference Room 1E-112, 450 110th Ave N.E.
Enatai Interceptors Upgrade
File Number: 19-113671-WA, 19-113673-WG, 19-113670-LB and 19-113672-LO
Land Use review of a Shoreline Conditional Use Permit, Shoreline Substantial Development Permit, Conditional Use Permit, and Critical Areas Land Use Permit to repair and replace the King County sewer mains that cross Lake Washington from Mercer Island to reach the Sweyolocken Pump Station on Bellevue Way SE. A new sewer main will be bored underground from the Enatai Beach Park, under the Enatai neighborhood to reach the Sweyolocken Pump Station facility. The existing sewer line in Lake Washington that handles low flows and services houses along Lake Washington through the Mercer Slough is proposed to be repaired. Temporary construction impacts from this project include disturbance of Lake Washington and lake bed, disturbance of steep slopes, disturbance of wetlands in Mercer Slough, temporary closure of Enatai Beach Park, and temporary impacts from a sewer bypass located on private properties south of I-90 and north of Lake Washington. The objective of the Enatai Interceptor Upgrade Project is to improve reliability and increase the capacity of the existing facility and pipeline components of the regional wastewater system in the southwest portion of Bellevue and the Town of Beaux Arts Village.
Approvals Required: Shoreline Conditional Use Permit approval, Shoreline Substantial Development Permit approval, Conditional Use Permit, Critical Area Land Use Permit and ancillary permits and approvals.
SEPA: Determination of Non-Significance was issued by King County on May 23, 2019.
Staff Contact: Reilly Pittman, 425-452-4350, rpittman@bellevuewa.gov