Demolition Permit

This permit is required for demolition of the whole or part of any permanent structure, including a single-family house, multifamily or commercial structure, garage or storage shed. The permit includes clearing & grading if the foundation is being removed. It may or may not include SEPA review. (BE)

A demolition permit is not required if the structure to be demolished is currently exempt from the requirements for a building permit under Bellevue City Code 23.05.090. 

Note: Some projects may qualify for a demolition permit without plan review.

Email a link to this page

Apply Online

You must apply for this permit online through MyBuildingPermit. We will not accept paper applications or plans.

Learn more about our online permitting services.

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. You may also print out a permit document list.

Project Specific Plan Requirements

These items may be required during plan review, as determined by the scope of your project.

Submittal Information and Forms

Permit Fees

Timelines

Inspections