Document Library
Recently Updated:Summary Report to City Council - March 2013Updated Scoping Report (Includes Guiding Principles) - May 2012Guiding Principles - February, 2012Status Report on Downtown Projects - February 2012This page is a compilation of existing conditions, plans, projects, policies and other material related to the Downtown Transportation Plan Update. Items noted with an asterisk (*) are planned or ongoing documents that will be linked when updated or completed.
I. Project InformationII. Existing ConditionsIII. Existing Plans, Projects, and PoliciesIV. 2030 BKR Travel Demand ModelV. Meeting MaterialsVI. Consultant DeliverablesI. PROJECT INFORMATION A. Introduction 1. Background a) Frequently Asked Questions 2. Scope a) Scope of Work b) Strategy for Public Involvement c) Guiding Principles d) Scoping Report
II. EXISTING CONDITIONS A. General 1. Maps a) Downtown Aerial Photo b) Parcels and Building Footprints Map c) Downtown Base Map d) Zoning Map 2. Demographics a) The Changing Face of Downtown Bellevue, Latest Information On Community Demographics, 2011 b) Citywide and Downtown Total Employment Estimates c) Downtown Land Use Data B. Roadway Capacity and Operations 1. Facilities a) Downtown Roadway Network Map b) Downtown Bellevue Arterial Classification Map c) Downtown On-Street Parking Map d) Downtown Signalized Intersections Map 2. Operations a) 2010 Average Annual Weekday Traffic Map b) Downtown Bellevue Traffic Conditions by Time of Day c) SCATS Presentation to City Council, March 2011 3. Available Online a) 2010 Traffic Data Book b) 2008 City of Bellevue Downtown Parking Report C. Transit Service and Operations 1. Facilities, Routes, and Operations a) 2011 Eastside Transit Routes Map b) Transit Network Map c) Transit Ridership Map d) Rapid Ride B Line Map e) Private Transit* 2. Available Online a) Fall 2011 Detailed Transit Route Maps* D. Non-Motorized Transportation 1. Facilities a) Bicycling in Bellevue Map b) Bellevue Pedestrian Guide c) Downtown Bicycle Facilities Map d) Downtown Sidewalks Map e) Pedestrian Current Conditions Map f ) Pedestrian Candidate Enhancements Map 2. Operations a) 2009 Pedestrian and Bicycle Count b) 2010 Pedestrian and Bicycle Count c) 2011 Pedestrian and Bicycle Count
III. EXISTING PLANS, PROJECTS, AND POLICIES A. Comprehensive Plan 1. Subarea Plan a) Downtown Bellevue Regional and Local Planning Context b) Downtown Subarea Plan c) Status Report on Downtown Projects, Februaray 2012 2. Available Online a) Comprehensive Plan – Transportation Element b) Comprehensive Plan – Land Use Element c) 2020 Bel-Red Subarea Plan B. Transportation Demand Management 1. Plans and Reports a) Bellevue Connect Downtown Plan Executive Summary b) 2008 Mode Share Summary Report (Downtown Only) 2. Available Online a) Commute Trip Reduction Plan b) Bellevue Connect Downtown Plan c) 2008 Mode Share Summary Report C. Roadway Capacity and Operations 1. Facilities a) Refer to Section IV. A. 1. 2030 Transportation* b) Mobility Infrastructure Initiative Map Projects Overview Map 2. Operations a) ITS Master Plan Introduction and Deployment Plan Summary, July 2004 3. Available Online a) ITS Master Plan, July 2004 D. Transit Service and Operations 1. East Link a) ST FEIS East Link Exec Summary (Segment C and Alternative C9T Only), July 2011 2. Bus Service a) 2011 King County Strategic Plan for Public Transportation Executive Summary b) Downtown Circulator Council Study Session, December 2008 3. Available Online a) 2003 Bellevue Transit Plan b) 2011 King Co. Metro Service Guidelines c) King Co. Strategic Plan for Public Transportation d) Downtown Bellevue Light Rail Concept Design Report, February 2010 e) City of Bellevue Downtown Circulator Implementation Plan, May 2007 E. Non-Motorized Transportation 1. Plans a) 2009 Pedestrian and Bicycle Transportation Plan Executive Summary b) Photo Visualization Report (Downtown Only) c) Downtown Bicycle Plan Projects and Corridors Map d) Downtown Pedestrian Plan Projects Map 2. Available Online a) 2009 Pedestrian and Bicycle Transportation Plan b) 2010 Ped Bike Progress Report c) Pedestrian Corridor and Major Public Open Space Design Guidelines, March 2000
IV. 2030 BKR TRAVEL DEMAND MODEL* A. Baseline Assumptions 1. 2030 Transportation* 2. 2030 Land Use* B. Model Output 1. Travel Demand Forecast Results*
V. MEETING MATERIALS A. See Timeline and Public Events
VI. CONSULTANT DELIVERABLES A. Best Practices Report* B. Existing Conditions Report* C. Roadway Capacity and Operations Recommendations* D. Transit Service and Operations Recommendations* E. Non-Motorized Transportation Recommendations* F. Implementation Plan Recommendations* G. Final Report*
Transportation 450 110th Ave. NE P.O. Box 90012 Bellevue, WA 98009 Contact: Kevin McDonald Phone: 425-452-4558 E-mail: kmcdonald@bellevuewa.gov